Environmental Protection


The Environmental Protection Plans provide detailed, site-specific environmental protection measures to be implemented by the contractors and construction staff to minimize environmental effects from construction of the generating station and south access road. They are designed for use as reference documents providing the best management practices to meet or exceed regulatory requirements.

Environmental Protection Plans are organized by construction activity, highlighting measures to reduce the impact of a specific work activity (e.g., tree clearing or material placement in water). Contractors’ compliance with the Environmental Protection Plans is a contractual obligation. Under Manitoba Hydro’s construction site management, a Site Environmental Lead will be responsible for monitoring compliance and determining when corrective actions are required.

Environmental Protection Plans

Keeyask Generation Station Construction Environmental Protection Plan

South Access Road Environmental Protection Plan

2021–2022 Annual Report

2021–2022 Environmental Protection Plan Report

2020–2021 Annual Report

2020–2021 Environmental Protection Plan Report

2019–2020 Annual Report

2019–2020 Environmental Protection Plan Report

2018–2019 Annual Report

2018–2019 Environmental Protection Plan Report

2017–2018 Annual Report

2017–2018 Environmental Protection Plan Report

2016–2017 Annual Report

2016–2017 Environmental Protection Plan Report

2015–2016 Annual Report

2015–2016 Environmental Protection Plan Report

2014–2015 Annual Report

2014–2015 Environmental Protection Report