2014 – 2015 Monitoring Reports:
KIP_ENVPP_Annual_Report_2014-15_Final
KIP_TAMP Amphibian Report _2014-2015 20151223_Final
KIP_TAMP_Avian_Report_2014-2015_2015_Final
KIP_TAMP_Mammals_Report_2014-2015_Final
KIP_TAMP_Plant_and_Habitat_Report_2014_2015_Final
KIP_TAMP_Water_Quality_Annual_Report_2014-15_Final
2013 – 2014 Monitoring Reports:
KIP_ENVPP_Report_2013-14_Final
KIP SEMP Final Report 2013 – 2014
KIP_TAMP_Amphibian_Annual_Report_2013-14_Final
KIP_TAMP_Avian_Annual_Report_2013-14_Final
KIP_TAMP_Mammals_Annual_Report_2013-14_Final
KIP_TAMP_Plants_Habitat_and_Ecosystems_Annual_Report_2013-14_Final
KIP_TAMP_Water_Quality_Annual_Report_2013-14_Final
Environmental Assessment (EA) Report
Keeyask Infrastructure Project (KIP) – Complete (151MB PDF)
EA License
EA Reports, Appendices and Figures
02 EA Report and Appendices Part 01
02 EA Report and Appendices Part 02
02 EA Report and Appendices Part 03 Figure 3.4-1
02 EA Report and Appendices Part 04 Figure 3.4-2
02 EA Report and Appendices Part 05 Figure 3.4-3
02 EA Report and Appendices Part 06 Figures 3.4-4 to 7 and PIP
02 EA Report and Appendices Part 07 Appendix A Proj Description
02 EA Report and Appendices Part 08 Figure B2-1
02 EA Report and Appendices Part 09 B3-1
02 EA Report and Appendices Part 10 Figure B3-2 to B4-2
02 EA Report and Appendices Part 11 Figure B4-4
02 EA Report and Appendices Part 12 Figure B4-5
02 EA Report and Appendices Part 13
02 EA Report and Appendices Part 14
03 EA Figures Part 01 Figure 1.3-1 to 2.3-1
03 EA Figures Part 02 Figure 2.3-2 to 3.2-2
03 EA Figures Part 03 Figure 3.4-1
03 EA Figures Part 04 Figure 3.4-2
03 EA Figures Part 05 Figure 3.4-3
03 EA Figures Part 06 Figure 3.4-4 to 3.4-7
03 EA Figures Part 07 Figure B2-1
03 EA Figures Part 08 Figure B3-1
03 EA Figures Part 09 Figure B3-2
03 EA Figures Part 10 Figure B4-4
03 EA Figures Part 11Figure B4-5
03 EA Figures Part 12 Figure B4-6
EA Report Addendums
04 EA Report Addendum 1 Part 01
04 EA Report Addendum 1 Part 02
04 EA Report Addendum 1 Part 03
04 EA Report Addendum 1 Part 04
05 EA Report Addendum 2 Part 01
05 EA Report Addendum 2 Part 02
06 Concept Design for Wastewater Disposal
07 Drain Field Design Information
08 North Access Road Startup Camp
10 Keeyask Construction Camp STP
2012 – 2013 Monitoring Reports
KIP EnvPP Annual Report 2012 – 2013
KIP SEMP Annual Report 2012 – 2013
KIP TAMP Amphibian Monitoring Annual Report 2012 – 2013
KIP TAMP Avian Monitoring Annual Report 2012 – 2013
KIP TAMP Mammals Monitoring Annual Report 2012 – 2013
KIP TAMP Plants Habitat and Ecosystems Monitoring Annual Report 2012 – 2013
KIP TAMP Water Quality Monitoring Annual Report 2012 – 2013
A submission for environmental approval for KIP was filed in July 2009. Regulatory approval was granted in March of 2011.
KIP Environmental Assessment Report and Environment Act Proposal Form:
Report (PDF)
Appendix A (PDF)
Appendix B (PDF)
Appendix C (PDF)
Appendix D (PDF)
Appendix E (PDF)